为进一步强化班级常规管理的目标意识,充分调动全体师生参与管理的主动性和积极性,增强常规工作的科学性和可操作性,促进良好的班风、学风和校风的形成,现土木工程学院结合2020-2021-1学年班级常规工作定量数据开展星级评定工作,现将评定结果进行公示。
2020-2021-1学年班级星级评定数据汇总表 | |||||||||
年级 | 班级 | 学情分析 | 分值(40%) | 青年大学习 | 分值(30%) | 微哨打卡 | 分值(30%) | 总分 | 星级 |
2017级 | 土木20172 | 89.66% | 35.86 | 97.46% | 29.24 | 92.17% | 27.65 | 92.75 | ☆☆☆ |
土木20171 | 88.89% | 35.56 | 96.66% | 29.00 | 81.00% | 24.30 | 88.85 | ☆☆☆ | |
土木2017卓越 | 74.19% | 29.68 | 84.41% | 25.32 | 92.17% | 27.65 | 82.65 | ☆☆☆ | |
工造20174 | 94.12% | 37.65 | 74.33% | 22.30 | 75.33% | 22.60 | 82.55 | ☆☆☆ | |
工造20171 | 100.00% | 40.00 | 66.65% | 20.00 | 75.17% | 22.55 | 82.55 | ☆☆☆ | |
土木20174 | 87.88% | 35.15 | 76.79% | 23.04 | 70.83% | 21.25 | 79.44 | ☆☆ | |
给排20171 | 96.77% | 38.71 | 58.87% | 17.66 | 76.50% | 22.95 | 79.32 | ☆☆ | |
工造20176 | 85.71% | 34.28 | 61.11% | 18.33 | 88.83% | 26.65 | 79.27 | ☆☆ | |
工造20172 | 100.00% | 40.00 | 58.81% | 17.64 | 72.00% | 21.60 | 79.24 | ☆☆ | |
给排20172 | 96.87% | 38.75 | 52.02% | 15.61 | 79.33% | 23.80 | 78.15 | ☆☆ | |
工造20177 | 82.76% | 33.10 | 75.64% | 22.69 | 72.67% | 21.80 | 77.60 | ☆ | |
工造20173 | 100.00% | 40.00 | 74.02% | 22.21 | 47.17% | 14.15 | 76.36 | ☆ | |
给排20173 | 100.00% | 40.00 | 43.55% | 13.07 | 60.33% | 18.10 | 71.17 | ☆ | |
工造20175 | 73.08% | 29.23 | 60.39% | 18.12 | 72.83% | 21.85 | 69.20 | ☆ | |
土木20173 | 66.67% | 26.67 | 69.93% | 20.98 | 49.67% | 14.90 | 62.55 | ☆ | |
2018级 | 土木2018卓越 | 96.55% | 38.62 | 83.62% | 25.09 | 97.17% | 29.15 | 92.86 | ☆☆☆ |
土木20184 | 95.83% | 38.33 | 88.06% | 26.42 | 87.17% | 26.15 | 90.90 | ☆☆☆ | |
工造20183 | 86.67% | 34.67 | 88.06% | 26.42 | 97.17% | 29.15 | 90.24 | ☆☆☆ | |
工造20184 | 90.32% | 36.13 | 89.52% | 26.86 | 87.33% | 26.20 | 89.18 | ☆☆☆ | |
建工(专)20181 | 100.00% | 40.00 | 79.43% | 23.83 | 82.33% | 24.70 | 88.53 | ☆☆☆ | |
土木20185 | 84.00% | 33.60 | 89.99% | 27.00 | 86.00% | 25.80 | 86.40 | ☆☆☆ | |
工造20181 | 77.78% | 31.11 | 89.16% | 26.75 | 92.50% | 27.75 | 85.61 | ☆☆ | |
工造20182 | 93.55% | 37.42 | 72.23% | 21.67 | 87.33% | 26.20 | 85.29 | ☆☆ | |
给排20183 | 73.33% | 29.33 | 85.00% | 25.50 | 92.83% | 27.85 | 82.68 | ☆☆ | |
工造20186 | 56.67% | 22.67 | 99.17% | 29.75 | 98.83% | 29.65 | 82.07 | ☆☆ | |
给排20182 | 57.14% | 22.86 | 92.86% | 27.86 | 98.17% | 29.45 | 80.16 | ☆☆ | |
工造20187 | 53.33% | 21.33 | 99.44% | 29.83 | 94.00% | 28.20 | 79.36 | ☆☆ | |
工造(专)20181 | 82.76% | 33.10 | 62.98% | 18.89 | 78.33% | 23.50 | 75.50 | ☆ | |
土木20181 | 47.83% | 19.13 | 90.94% | 27.28 | 95.83% | 28.75 | 75.16 | ☆ | |
工造20185 | 43.33% | 17.33 | 98.61% | 29.58 | 94.00% | 28.20 | 75.12 | ☆ | |
土木20183 | 50.00% | 20.00 | 88.14% | 26.44 | 84.00% | 25.20 | 71.64 | ☆ | |
给排20181 | 37.93% | 15.17 | 81.03% | 24.31 | 89.00% | 26.70 | 66.18 | ☆ | |
土木20182 | 61.54% | 24.62 | 62.44% | 18.73 | 74.17% | 22.25 | 65.60 | ☆ | |
2019级 | 土木2019卓越 | 71.43% | 28.57 | 100.00% | 30.00 | 100.00% | 30.00 | 88.57 | ☆☆☆ |
土木20195 | 66.67% | 26.67 | 99.31% | 29.79 | 97.33% | 29.20 | 85.66 | ☆☆☆ | |
工造20193 | 71.43% | 28.57 | 89.22% | 26.77 | 92.17% | 27.65 | 82.99 | ☆☆☆ | |
工造20192 | 61.11% | 24.44 | 100.01% | 30.00 | 94.83% | 28.45 | 82.90 | ☆☆☆ | |
给排20192 | 64.29% | 25.72 | 91.07% | 27.32 | 99.33% | 29.80 | 82.84 | ☆☆ | |
工造20191 | 77.14% | 30.86 | 76.90% | 23.07 | 96.33% | 28.90 | 82.83 | ☆☆ | |
给排20191 | 59.37% | 23.75 | 93.49% | 28.05 | 89.17% | 26.75 | 78.55 | ☆☆ | |
土木20193 | 43.75% | 17.50 | 97.14% | 29.14 | 97.50% | 29.25 | 75.89 | ☆☆ | |
给排20193 | 42.31% | 16.92 | 95.74% | 28.72 | 97.33% | 29.20 | 74.85 | ☆ | |
土木20194 | 25.00% | 10.00 | 95.83% | 28.75 | 97.50% | 29.25 | 68.00 | ☆ | |
土木20192 | 21.87% | 8.75 | 97.66% | 29.30 | 95.83% | 28.75 | 66.80 | ☆ | |
土木20191 | 16.13% | 6.45 | 84.48% | 25.34 | 100.00% | 30.00 | 61.80 | ☆ | |
2020级 | 土木20205 | 86.67% | 34.67 | 101.67% | 30.00 | 100.00% | 30.00 | 94.67 | ☆☆☆ |
工造20202 | 84.85% | 33.94 | 94.70% | 28.41 | 99.00% | 29.70 | 92.05 | ☆☆☆ | |
工造20203 | 77.42% | 30.97 | 96.24% | 28.87 | 92.83% | 27.85 | 87.69 | ☆☆☆ | |
工造20201 | 67.65% | 27.06 | 99.75% | 29.93 | 100.00% | 30.00 | 86.99 | ☆☆ | |
给排20201 | 68.75% | 27.50 | 98.18% | 29.45 | 96.83% | 29.05 | 86.00 | ☆☆ | |
给排20202 | 62.50% | 25.00 | 96.91% | 29.07 | 99.50% | 29.85 | 83.92 | ☆☆ | |
土木20202 | 60.53% | 24.21 | 100.22% | 30.00 | 99.00% | 29.70 | 83.91 | ☆☆ | |
给排20203 | 53.12% | 21.25 | 97.69% | 29.31 | 95.33% | 28.60 | 79.16 | ☆ | |
土木20203 | 51.35% | 20.54 | 100.69% | 30.00 | 94.83% | 28.45 | 78.99 | ☆ | |
土木20204 | 40.54% | 16.22 | 100.23% | 30.00 | 100.00% | 30.00 | 76.22 | ☆ | |
土木20201 | 36.84% | 14.74 | 96.05% | 28.82 | 100.00% | 30.00 | 73.55 | ☆ |
本次参评数据均以教学办、学工办统计为准,若对参评数据及评
定结果有任何异议,请于3天工作日内(3月12日至3月16日)通过电话、信函、来访等方式向土木工程学院学生工作办公室反映。反映情况要实事求是、有理有据,并提供联系方式,以便调查核实。
联系方式:土木工程学院学生工作办公室(5505876)
土木工程学院学生工作办公室
2021年3月12日
编辑:学工办